Contact us |
|
Call |
86--371--64234116 |
Fax |
86--371--64233116 |
Add
|
GongYi HeNan China |
|
|
|
|
|
your pasition now>>product list |
|
|
Pressure to the power cable
|
|
1, the scope of application |
|
This product is applicable to the exchange of rated voltage 35kv transmission distribution lines. A lightweight, structure simple, user-friendly, Kai damage small, chemical corrosion resistance
And the installation of high mechanical strength from the gap constraints, environmental stress tolerance, good performance and excellent resistance aging electrical performance characteristics. |
Second, the implementation of standards |
|
GB/Tl2706.1.3-2002 |
|
Third, the use of identity |
|
1. Long cable conductor temperature should be allowed to work no more than 90 degrees, short circuit (5s) conductor maximum temperature of 250 degrees; Laying environmental temperature should be no less than
0 ℃ 。
2. Cable laying cables to be installed to allow bending radius Chanxin Waijing not less than 15 times cable; Three core cable should be not less than 10 times cable Waijing. |
4, type, name, working conditions |
|
Type of |
Name called |
Of pieces for the |
Copper core |
Aluminum core |
Yjv |
Yjlv |
To the polyethylene insulation PVC sheathed power cables |
Elevated, indoor, tunnels, pipelines and electricity
Cable Gap |
ZR-YJV |
ZR-YJLV |
Fire to the polyethylene insulation PVC sheathed power cables |
Elevated, indoor, tunnel and cable Gap, etc.
Corresponding need for fire |
Yjv 22 |
Yjlv 22 |
To the polyethylene insulation PVC installed electricity meter steel wire cables 132,800 |
Indoor, tunnels, and underground cables Gap.
Mechanical external forces to bear |
Yjv 32 |
Yjlv 32 |
To the polyethylene insulation PVC installed electricity meter steel wire cables 132,800 |
Indoor, tunnels, and underground cables Gap.
Mechanical external forces to bear |
Yjv 42 |
Yjlv 42 |
To the polyethylene insulation PVC installed electricity meter steel wire cables 132,800 |
Indoor, tunnels, and underground cables Gap.
Mechanical external forces to bear |
ZR-YJV 22 |
ZRC-YJLV 22 |
Fire to the polyethylene insulation PVC sheathed power cables installed harmonic 132,800 |
Indoor, tunnels, underground cables Gap and the corresponding need for fire to bear mechanical external forces |
ZR-YJV 32 |
ZRC-YJLV 32 |
Fire to the polyethylene insulation PVC sheathed power cables installed harmonic 132,800 |
Indoor, tunnels, underground cables Gap and the corresponding need for fire to bear mechanical external forces |
ZR-YJV 42 |
ZRC-YJLV 42 |
Fire to the polyethylene insulation PVC sheathed power cables installed harmonic 132,800 |
Indoor, tunnels, underground cables Gap and the corresponding need for fire to bear mechanical external forces |
Note : According to the production of user requirements (NH) fire-resistant type. |
5, the scope of specifications |
|
Type of |
Several core |
The said tender side (mm 2 ) |
Copper core |
Aluminum core |
Yjv
ZRC-YJV |
Yjlv
ZRC-YJLV |
1-5 |
1 . 5—240 |
3+1 |
1 . 5—240 |
3+2 |
2 . 5—185 |
4+1 |
2 . 5—185 |
Yjv 22
ZR-YJV 22 |
Yjlv 22
ZR-YJLV 22 |
2-5 |
1 . 5—240 |
Yjv 22
ZR-YJV 32 |
Yjlv 22
ZR-YJLV 32 |
3+1 |
1 . 5—240 |
Yjv 22
ZR-YJV 42 |
Yjlv 22
ZR-YJLV 42 |
3+2 |
2 . 5—150 |
4+1 |
2 . 5—150 |
|
|
|